Fall is budget season for a lot of stratas in North Vancouver and Vancouver. Councils are turning depreciation report items into a budget, and some of that work will not fit inside the contingency reserve fund. That is when a special levy goes on the AGM agenda.
A levy vote succeeds or fails on one thing: whether owners trust the number. This guide covers how BC stratas pay for repairs, which vote each option needs, and how to get a price owners will approve.
Every repair a strata takes on is paid for in one of three ways, or a mix of them. Each one needs a different level of owner approval.
Operating budget
Majority vote
Routine maintenance and smaller repairs that recur every year. Approved as part of the annual budget at the AGM by majority vote.
Special levy
3/4 vote
A one-time charge to owners when the reserve fund cannot cover the work. Needs a 3/4 vote at a general meeting.
Contingency reserve fund
Majority or 3/4 vote
Money set aside for repairs that do not happen every year. Spending is a majority vote when the work is recommended in the depreciation report, and a 3/4 vote in almost all other cases.
A combination
Separate votes
Many projects use part of the reserve fund and a smaller levy for the rest. Each part needs its own resolution.
Confirm the specifics for your building with your strata management company. Bylaws and the wording of your depreciation report both affect which vote applies.
Since November 2023, BC stratas must put at least 10% of their operating budget into the contingency reserve fund each year. That helps over time, but a building that underfunded its reserve for years still has a gap when large items come due.
A levy is usually the right tool when:
  • The reserve fund cannot cover the work. Draining the fund for one project leaves nothing for the next surprise.
  • The work cannot wait. Deferring failing components often turns a repair into a replacement.
  • Owners need a defined, one-time cost. A levy has a fixed purpose, a fixed total and fixed payment dates. Owners know exactly what they are paying for.
  • The depreciation report already flags it. Owners take a levy more seriously when an independent report put the item on the list first.
A special levy resolution must state:
  • The purpose of the levy. What work it pays for.
  • The total amount. The full sum being raised.
  • How each strata lot’s share is calculated. Usually by unit entitlement.
  • The amount each strata lot pays.
  • The date or dates payments are due.
If a unit sells after the levy is approved, the seller pays what is due before the sale completes and the buyer pays what is due after. If the work comes in under budget and an owner would get back more than $100, the surplus is refunded to owners.
The most common reason a levy fails is a weak number. Owners see a round figure copied from a depreciation report, with no scope behind it, and vote it down. Or the levy passes, the real price comes in higher, and council has to go back to owners a second time.
Depreciation report costs are planning estimates. They are built to model funding over 30 years, not to price a specific job in your building this spring. Current pricing, access, occupied-building conditions and the actual state of the component all move the real cost.
1. Pull the items that are due in the next 3 years
Start with the depreciation report and sort by remaining service life, not by dollar amount. Those are the items most likely to need funding at this AGM.
2. Get the work walked and priced against real conditions
A contractor who walks the building can tell you what the report missed, what can be grouped and what the work costs today. Ask for a budgetary scope with line items, not a single number.
3. Group work that shares access
Hallways, lobbies and stairwells done together cost less than three separate projects. One mobilization, one set of protections, one round of disruption for residents.
4. Build in a contingency and say so
Put a stated contingency inside the levy amount, usually 10% to 15% on renovation work. Owners accept a contingency they can see. They do not accept a second levy.
5. Put the scope in the AGM package
Owners vote with more confidence when they can read what the money buys. A one-page summary of the scope, the price and the schedule does more than a long explanation from the floor.
Notice of a general meeting has to go out at least two weeks before the meeting, so the pricing needs to be done well before that.
Prepare answers to these before the AGM:
  • Why now? Show the remaining service life and what happens if the work waits.
  • Why this much? Show the line items and the contingency.
  • Why not use the reserve fund? Show the fund balance and what it still needs to cover.
  • When will it be done? Give a start window and a working schedule.
  • How will it affect residents? Explain work hours, elevator use and access.
Getting ready for an AGM?
We walk the building and give your council a budgetary scope with line items before the meeting. No cost, no obligation.
Or call directly
Phalanx Construction works with strata councils and property managers across North Vancouver, West Vancouver and Vancouver, including the West End and Kitsilano. We walk the building, scope the work against real conditions, and give council a written price it can put in front of owners.
Common areas, suite repairs, depreciation report items and multi-unit work are handled by one crew under one scope, scheduled around residents and building rules.