• Existing paving stones removed at the drain location and set aside for reinstatement
  • Excavation completed by hand to accommodate catch basin and connecting pipe
  • Catch basin set and pipe run connected to site drainage
  • Paving stones reinstated around the basin with consistent joints and level finish
  • Post footings set along the full property line run
  • Horizontal cedar board cladding installed on post framework
  • Consistent spacing and alignment maintained throughout the full fence run
  • Cedar finished and installed to complement the existing building exterior
  • Narrow side yard required hand-carrying all materials through a restricted corridor
  • Material staging planned before site start to avoid disruption to adjacent strata units
  • Drainage and fence scopes sequenced to avoid conflict between crews and material runs
  • Full site cleanup completed on handback with all excavated material removed
  • Work completed without disruption to surrounding units or common areas
  • All access routes through common property managed and restored on completion
  • Scope coordinated to meet requirements for work on shared property