Cedar Deck Replacement and Extension in North Vancouver
Scope
Deck Replacement
Framing Over Concrete
Cedar Decking
Deck Extension
Location
North Vancouver, BC
Description
Full deck replacement and extension completed on a residential property in North Vancouver. The client called about a tired 12 year old cedar deck, expecting new boards and a few reinforced joists. Once the decking came off, the job changed: every joist was rotten, because the original builder had never lifted them onto footings and had instead built up the ground for the joists to rest on.
The deck also sat over an old sloped concrete pad, which is very likely what drove that decision in the first place. All of the original framing had to come out. The concrete did not. Breaking out and disposing of the slab would have added notable cost and duration, so the deck was reframed over it on low profile footings and vinyl shims instead. Phalanx regularly handles this type of scope on North Shore properties where existing site conditions dictate how a rebuild has to be approached.
Outcome
The deck now sits on framing that is clear of both soil and concrete, with water and air able to move underneath it. The cedar surface carries no visible fasteners and no face holes for water to collect in. The deck was extended in length under the same scope, and the site was handed back clean with all demolished framing and decking removed.
A few details around the perimeter are constrained by the slope in the existing slab. That trade-off was identified and presented before the rebuild started rather than after, and the client chose to keep the concrete and the budget where they were.
Demolition and Framing
- Existing cedar decking and all original framing removed and disposed of
- Rotten joists and built up soil cleared out from under the deck footprint
- Existing sloped concrete pad retained rather than broken out and hauled away
- New treated framing set on low profile footings and vinyl shims, clear of soil and concrete
Cedar Decking and Finish
- New cedar decking laid across the full footprint including the extended section
- Boards fixed with a hidden fastener system driven at 45 degrees through the board edge
- No screw heads across the deck surface and no face holes for water to sit in
- Consistent board spacing and alignment maintained across the full run
Scope Change and Approval
- Original scope reassessed on site once the decking came off and the framing was visible
- Full framing removal explained and approved by the client before further demolition started
- Concrete removal presented as a priced option rather than assumed into the scope
- Constrained details around the sloped slab identified before the rebuild, not after
Neighbouring Property Considerations
- Neighbouring deck extended under the same mobilisation at the owner’s request
- Staining scheduled on that deck so the new boards blend into the existing weathered cedar
- River rock walkway and paving stone work scheduled as a follow-up on the same site