• Natural log beams shaped on site with a chainsaw and set before framing began
  • Joists laid out and cut to a curved front edge rather than framed square to the building
  • Cedar decking installed across the full curved footprint
  • Log beams left exposed around the perimeter as part of the finished structure
  • Paving stones cut on site to suit the patio layout and edge conditions
  • Patio set on prepared base with consistent joints and a level finish
  • Walkway run from the patio through to the building access
  • Finished surfaces set cleanly into the surrounding lawn and planting
  • Deck footprint set out to the ground rather than to the building line
  • Log beams shaped on site rather than ordered to dimension
  • Every bearing point cut individually to suit the beam it lands on
  • Additional time for on-site shaping built into the schedule at quoting stage
  • Cedar left unstained and allowed to weather naturally
  • Silvering has come in evenly across the full deck surface
  • Log beams and driftwood elements have weathered in alongside the decking
  • Staining remains an option where an owner wants the original colour brought back