The cedar decking had rotted more than 12 years should account for. The plan was to replace the boards and reinforce a few of the weaker joists.
What we found once the decking came off was that the previous builder had never lifted the joists off the ground. Instead the soil had been built up so the joists could rest on it, which avoided using hangers and proper structural fasteners. Every one of those joists was rotten, and they had been wicking water up into the decking for years. The deck was rotting from underneath, which is why it failed early.
The deck also sat over an old sloped concrete pad. That is very likely what led to the original decision in the first place.
Removing all of the old framing was the only real option, and the client understood that before we started pulling it out. What we did not do was remove the concrete. Breaking it out and disposing of it would have added notable cost and days to the project, and the slab was not the thing that failed. We framed over it on a series of vinyl shims and low profile footings instead.
A few details around the concrete are not perfect because of the slope in that slab. We said so before we built it rather than after, and the client chose to keep the budget where it was. The deck was rebuilt in treated framing with new cedar decking, and we extended its length while we were there. Staining is a later step.
The neighbours asked us to extend theirs while we were on site, which we did, and we are staining that one so the new boards blend into the older wood. The same yard is getting a river rock walkway with paving stone work as a follow-up, alongside basic landscaping and site work.