Renovating a condo is different from renovating a house. Before any work starts, the strata has a say, the building has rules, and some of the work needs a permit as well.
Skipping a step can mean a stop-work notice from council, daily fines, or being made to undo work at your own cost. This guide walks through the approval process for condo renovations in Vancouver, including the West End and Kitsilano, and on the North Shore.
Why a condo renovation needs strata approval
In a strata building, some of what looks like your unit is not entirely yours to change. Structure, exterior walls, windows and some pipes and wiring are either common property or parts of the building the strata has to insure.
Under BC’s standard strata bylaws, an owner must get written approval from the strata corporation before making alterations that involve:
- The structure of the building.
- The exterior of the building, including doors, windows and skylights on the exterior or facing common property.
- Balconies, stairs, chimneys, fences and railings.
- Common property inside the unit.
- Parts of the unit the strata must insure.
Many buildings have amended these bylaws to cover more, such as all flooring changes or any plumbing or electrical work. Always read your own building’s current bylaws and rules first.
What an alteration agreement is
The strata cannot unreasonably refuse an alteration, but it can approve it on conditions. The most common condition is an alteration agreement, sometimes called an indemnity agreement.
In it, the owner agrees in writing to take responsibility for the alteration. That usually means paying for any damage it causes, maintaining it from then on, and in many cases passing that responsibility to the next owner when the unit sells.
Read it carefully before signing. It can affect your costs for as long as you own the unit.
The approval process, step by step
1. Get the bylaws, rules and renovation policy
Ask your property manager for the current bylaws, any renovation rules and the application form. Look for flooring sound ratings, permitted work hours and any restrictions on plumbing or electrical changes.
2. Define the scope before you apply
Council approves what is on paper. Have your contractor write a clear scope: what is changing, where, the materials, and how noise and dust will be controlled.
3. Submit the application with contractor details
Most stratas ask for the contractor’s business licence, WorkSafeBC coverage and proof of liability insurance, often naming the strata as an additional insured.
4. Wait for council
Many councils meet once a month, so approval often takes four to six weeks. Missing information can push you to the next meeting.
5. Get the permits
Strata approval does not replace municipal permits. Apply once the scope is final.
6. Book the building
Book the elevator, loading area and any move-in dates with the building. Many stratas take a damage deposit for elevator and common area use.
When you also need a permit
In the City of Vancouver, the City of North Vancouver and the District of North Vancouver, permits depend on the work, not on whether the strata has approved it.
Usually no permit
Cosmetic work
Painting, replacing cabinets in the same layout, new countertops and replacing fixtures in the same location. Your strata may still need to approve it.
Electrical permit
New circuits and wiring
Electrical work beyond simple replacement needs a permit, taken out by a licensed electrical contractor.
Plumbing permit
Moving or adding fixtures
Relocating a sink, toilet or shower, or adding new plumbing lines, usually needs a plumbing permit.
Building permit
Walls and structure
Removing or moving walls, or anything that touches structure, usually needs a building permit and sometimes engineering.
Check with the municipality before work starts. Rules change, and unpermitted work can cause problems when you sell.
Building rules that shape the schedule
Even with approvals in hand, the building sets the pace:
- Work hours. Most stratas limit noisy work to weekday business hours.
- Elevator bookings. Deliveries and debris removal need booked time slots.
- Flooring sound ratings. New hard flooring usually needs an underlay that meets the bylaw’s minimum sound rating.
- Water shutoffs. Shutting off water to a riser affects neighbours and needs to be arranged with the building in advance.
- Neighbour notice. Good contractors let neighbours know when the noisy days are coming.
Questions to ask your contractor
- Have you renovated in occupied strata buildings before?
- Will you prepare the scope and paperwork for the strata application?
- Can you provide your licence, WorkSafeBC and insurance documents?
- Who arranges permits and inspections?
- How will you protect common areas and neighbours?
Renovating a condo?
We prepare the scope and contractor documents your strata asks for, and work within your building’s rules.
Or call directly
778-840-2215
Call or text, same day response
How Phalanx Handles Condo Renovations
Phalanx Construction renovates condos in strata buildings across Vancouver and the North Shore, including the West End, Kitsilano, North Vancouver and West Vancouver. We prepare the written scope and contractor documents for your strata application before any work starts.
Flooring, paint, tile, fixtures, trim and finishing are handled by one crew under one scope, scheduled around your building’s work hours and elevator bookings.

